
Inspection and certification of electrical installations were carried out, as well as the construction and testing of the medium-voltage (MV) electrical system at the C.P.E. Plant—including terminations and splices—and the low-voltage (LV) electrical system at the C.P.E. gas plant; additionally, installation and verification of the grounding system were performed, alongside VLF and contact resistance tests.